Design, Construction Oversight, and Operation, Maintenance & Monitoring

DESIGN AND CONSTRUCTION OVERSIGHT

Landmark has prepared design, bidding and contract documents for construction projects ranging in cost from $20,000 to $5,000,000. We’ve taken the project from design and bidding and contracting to overseeing the project through construction and providing operation, maintenance and monitoring as necessary. We’ve also completed the necessary reports documenting the implementation of the remedy and received approval from the appropriate government agency.

We’ve designed a variety of environmental remediation and corrective action projects, the following are a few examples:

* Contaminated soil excavation
* Capping
* Lead stabilization
* Bioremediation
* Soil vapor extraction systems for former dry cleaner or gasoline sites
* Free product recovery systems
* Groundwater pumpout systems
* Vapor barrier and vapor extraction and passive/active venting systems over former dumps or contaminated groundwater from gas stations
* Demolition of former industrial facilities including asbestos abatement; building waste removal; removal, cleaning and disposal of tank contents, piping and equipment; and removal of transformers and other PCB equipment and contaminated soil.

Our design services include the following items depending on what’s necessary for the project:

* Preparation of drawings and technical specifications
* Preparation of the waste profile and coordination with the landfill for contaminated soil disposal
* Preparation of a Site Safety Plan
* Submittals and notifications to regulatory agencies
* Preparation of bidding and contracting documents
* Coordination of a formal public bidding process (advertisement, pre-bid site walk, answering contractors questions, issuing addenda, compiling and evaluating bids, assisting with contract award and preparation of contract documents)
* Or coordination of a less formal bidding to three contractors
* Preparation of a unit price schedule and preparation of an engineer’s cost estimate prior to bid





transite1.jpg

Transite pipe encountered during excavation required asbestos abatement.

Our construction management or oversight services include the following:

* Managing the construction contract (oversight of contractor to assure implementation of design, coordinating the preconstruction meeting and weekly construction meetings, reviewing submittals, preparing change orders during construction, and review of applications for payment)
* Tracking the construction and engineering costs related to the environmental work and managing the project budget.
* Providing an experienced field scientist or engineer on site to oversee the construction activities and collect necessary samples depending on the response actions. Field staff document that the cleanup has been completed according to the response action plan.
* Coordinating with fixed based and/or mobile laboratories
* Managing contingency issues as they arise (underground storage tank, well, asbestos, drums, etc.)
* Coordinating with laboratory, reviewing analytical data and determining if response action goals have been met or whether addition excavation or response actions are necessary
* Tracking contaminated soil volumes and other quantities of waste

barrelpit.jpg

Potential hazardous building materials, asbestos and lead paint removal prior to demolition.

RESPONSE ACTION IMPLEMENTATION REPORT

Once the construction work is complete, Landmark will prepare a clear, concise report documenting the cleanup activities with tables, figures, and appendices showing the completed work. Our reports allow for easy review of the cleanup by the regulatory agency so that the client can get their approval letters or assurances in a timely manner. Landmark can also assist with negotiation and preparation of documents to file the necessary institutional controls.

OPERATION, MAINTENANCE & MONITORING

Some projects require a treatment system to operate on site for several weeks to several years. Landmark can prepare an operation, maintenance and monitoring (O, M, & M) plan and implement the O,M,&M Plan for the treatment system. Some remediation projects also require additional monitoring of groundwater, soil vapor and/or ambient indoor air quality after implementing a remediation to make sure the remediation was effective. Landmark can also help you to shut down a system and get project closure.

TLCvents.JPG

Vapor vents on two large 11-foot diameter stormwater pipes located over contaminated groundwater required air monitoring for one year after project completion.